![](https://laperlacasaresbeach.com/wp-content/uploads/2021/08/118807965_2790214167927506_6200305408025534360_n.jpeg)
The work to fix the rainwater drainage system in the La Perla de la Bahía housing development has been completed. The works have consisted of fixing a rainwater pipe that was crushed and made it impossible to drain, which was causing blockages and damaging the promenade in this area. With this work, a new pipe…
Read More